Friday, Mar 29 2024 | Time 13:44 Hrs(IST)
image
Entertainment » Other


Economic blockade cripples coal output and dispatch in Talcher

Angul, May 20 (UNI) The 12-hour economic blockade imposed by Talcher Surakhaya Manch (TSM) today crippled coal production and dispatch in Talcher coalfield.
Reports from Nalco and two NTPC power plant authorities said that there was no coal dispatch to these plants since this morning due to rail blockade by the demonstrators.
The Angul-puri passenger train was also cancelled today as the agitators squatted on the track at Talcher station.
There is no row at position 0.
image